After a week and maybe 20-25 hours the wiring on the control panel is completed and checked against the schematic... I think it is all correct. The lid opens and closes with minimal resistance from all the wire and there seems to be little pressure against any of the lugs. The #6 wire lugs are installed on the terminal strips and are ready for the main lines to be fed in and hooked up. In retrospect I probably could have used #8 or #10 from the Spa Panel to the control box since the Spa panel is mounted on the brew stand less than 3' below the Control Panel... oh well.
I have the fittings for the brew kettle - the valve is installed for the whirlpool with the new bulkhead fitting. The 45 degree fitting is loosely threaded onto the main drain in the kettle... yet to tighten that down and add the pick-up tube.
Still need to: Leak test the kettle, Mount the Spa Panel, Mount the 4 prong twist-lock receptacle in the Spa Panel, Make up the cord and connect to the kettle element/install twist-lock plug on the other end that will connect to the Control Panel, Make up the #6/4 power cord that will connect the Spa Panel to the Drier receptacle - appropriate plugs on each end (which I still don't know if it is 3 prong or 4 prong...praying for 4!!)
Maybe another week at the rate I work!
Don
Primary: nothing
Secondary: nothing
Bottled: Oatmeal Stout, APA and Rye IPA
(Only 2 cases of homebrew left...gotta get this rig up and running!)