We've finally finished the 'A+' and 'A' lists on the new-to-us house. So, I can start on some other projects. One of the weird things about the place is it used to be a daycare center and there is a complete second kitchen in the lower level. There are two double sinks, so one is coming out and will be the home of the new kegger.
Since this is my third one, I've got a handle on what is good to have. One feature will be the door. It won't just be the door, but also the floor of the kegger. It will roll out on big casters for easy replacement of kegs. I should be able to fit 6-7 kegs (revised, I decided on four). I'll use a small refrigerator on the counter to supply cooling, with holes in the bottom and fans to circulate cold air. Two of the taps will go up into the fridge and through a cold-plate for beverages that require extra cooling.
Since this isn't my only 'B' project and money is tight right now, it will probably be 3-4 months before I post anything.
Since this is my third one, I've got a handle on what is good to have. One feature will be the door. It won't just be the door, but also the floor of the kegger. It will roll out on big casters for easy replacement of kegs. I should be able to fit 6-7 kegs (revised, I decided on four). I'll use a small refrigerator on the counter to supply cooling, with holes in the bottom and fans to circulate cold air. Two of the taps will go up into the fridge and through a cold-plate for beverages that require extra cooling.
Since this isn't my only 'B' project and money is tight right now, it will probably be 3-4 months before I post anything.