In the middle of a panel build on 120 volt for my mini brewery. My question lies in where to place a lighted 3 post switch for my elements.
The Pid is controlled with a rocker switch and I want a lighted rocker (3 post) for the element to turn it on aside from the PID.
Do i place it before or after the heat sync and SSR?
Thanks.