crabtre
Active Member
I've been working on my Keezer build for several days now. Naturally it started out as a modest design idea... simple collar design attached to the lid. But the simple idea didn't last long mainly because I am not a fantastic woodworker and needed to make some adjustments to cover my mistakes.
Here are some pics in build order:
Collar assembled, prefinish -
Collar after finishing -
The Freezer lid has some rust spots so I wirebrushed it and spot painted around the edges -
My overtired, been working on it too long, mistake - make sure to measure ALL of the pieces before you assemble the collar...
To hide my "oops" I decided to build a frame that would fit over the top of the freezer lid, the edge of the collar and contain a chalkboard that can be used for labeling the taps...
See next post for remaining pics...
Here are some pics in build order:
Collar assembled, prefinish -
Collar after finishing -
The Freezer lid has some rust spots so I wirebrushed it and spot painted around the edges -
My overtired, been working on it too long, mistake - make sure to measure ALL of the pieces before you assemble the collar...
To hide my "oops" I decided to build a frame that would fit over the top of the freezer lid, the edge of the collar and contain a chalkboard that can be used for labeling the taps...
See next post for remaining pics...