So I'm a decent brewer (I think ) but I have very limited controls knowledge but some ability to learn. I am building a new brew set up, have most of the parts but want to add a control panel as follows... can anyone point me in the right direction to build what's below?
Need a panel that will house the following:
Switches for two Chugger pumps - Not looking to automate but want switches to simply turn the pumps on/off. Light indication would be cool.
Switches or buttons (three total) to turn on/off the Bayou burners (HTL, Mash Tun, Kettle). Ideally, I want to incorporate a pilot system so these switches will open the gas valves and trigger the (electric) pilot.
Any/all help is greatly appreciated especially if it's a equipment source and contact that I can use to discuss.
Thanks a bunch and happy brewing.
Cheers.
Need a panel that will house the following:
Switches for two Chugger pumps - Not looking to automate but want switches to simply turn the pumps on/off. Light indication would be cool.
Switches or buttons (three total) to turn on/off the Bayou burners (HTL, Mash Tun, Kettle). Ideally, I want to incorporate a pilot system so these switches will open the gas valves and trigger the (electric) pilot.
Any/all help is greatly appreciated especially if it's a equipment source and contact that I can use to discuss.
Thanks a bunch and happy brewing.
Cheers.