OneManBrewery
Well-Known Member
Well, I want to see if anybody is interested in my stand. I'm wanting to sell her to help with the cost of moving to electric. This would be great for someone looking to move up from the stove like I did and do all grain. I used the MoreBeer Tippy stand as a guide, but I changed it to suite me. The stand is 48" long and 53" from ground to 3rd tier. I made the stand large enough to fit keggles on any tier.
I MIG welded this stand in 2013 with 1.5" 12 gauge Steel tubing. A couple of build pictures [URL="https://www.homebrewtalk.com/showthread.php?t=328209&page=4]Here[/URL]. It's a tank, I've stood on every tier. The 3 burner shrouds are from BrewSteel (Are they still around?). I started out with 3 BG12 Burners and kept the system low pressure with a 2 Stage Regulator.
This year I did a lot of upgrading on this stand. I added a Honeywell Smart Valve to automate the 2nd Tier Burner and reconfigured the gas system with BrassCraft tubing and safety valves. I upgraded the 1st and 2nd Tier burners to BG14 burners with valves from BrewersHardware. I kept the one BG12 because it is only used for strike water. I wasn't happy with the casters so I got some heavy duty ones from TSC and welded them to the stand. Installed some diamond plating at the bottom. I also repainted it with High Heat black paint.
All included:
I'm looking for $700 or OBO. I live in the Johnson City area of Tennessee. I do have a trailer so I could deliver it a reasonable distance. Any questions or anything I left out please feel free to PM or Post.
PS I'm NOT parting out, I have my blood, sweat, and tears in this thing.
I MIG welded this stand in 2013 with 1.5" 12 gauge Steel tubing. A couple of build pictures [URL="https://www.homebrewtalk.com/showthread.php?t=328209&page=4]Here[/URL]. It's a tank, I've stood on every tier. The 3 burner shrouds are from BrewSteel (Are they still around?). I started out with 3 BG12 Burners and kept the system low pressure with a 2 Stage Regulator.
This year I did a lot of upgrading on this stand. I added a Honeywell Smart Valve to automate the 2nd Tier Burner and reconfigured the gas system with BrassCraft tubing and safety valves. I upgraded the 1st and 2nd Tier burners to BG14 burners with valves from BrewersHardware. I kept the one BG12 because it is only used for strike water. I wasn't happy with the casters so I got some heavy duty ones from TSC and welded them to the stand. Installed some diamond plating at the bottom. I also repainted it with High Heat black paint.
All included:
- Stand with Shrouds/Diamond plating
- 2 BG14 burners and 1 BG12
- Honeywell Smart Valve SV9501 and Pilot Burner
- 2 Stage Regulator
I'm looking for $700 or OBO. I live in the Johnson City area of Tennessee. I do have a trailer so I could deliver it a reasonable distance. Any questions or anything I left out please feel free to PM or Post.
PS I'm NOT parting out, I have my blood, sweat, and tears in this thing.





Last edited: