I have a brewtus-style stand partially complete. I'm stuck on the propane and temperature parts of the build.
My big dilema is not knowing about automation (auto flame control) and even if I did, would I want it?
Right now I'm thinking about plumbing the 3 burners, light them manually as required and taking all temperatures with a Thermapen. Pretty lame by some standards right? ;-)
What worries me is after I do this, I'll wish I would have spent just a little more and had a more "semi-automated" system....but I want to keep it as inexpensive as possible.
The part awaiting to be installed are:
2 HighPress BG14 (HLT and BOIL)
1 LowPress 6" 70kbtu (mash tun)
1 HighPress regulator
Here what my stand looks like currently. Help me finish please! ;-)
I need recommendations on regulators, line size, needle valves and any other (non-expensive) additions you think are mandatory. Basically, what would you do, within reason, to finish this. Thanks for any help guys.
My big dilema is not knowing about automation (auto flame control) and even if I did, would I want it?
Right now I'm thinking about plumbing the 3 burners, light them manually as required and taking all temperatures with a Thermapen. Pretty lame by some standards right? ;-)
What worries me is after I do this, I'll wish I would have spent just a little more and had a more "semi-automated" system....but I want to keep it as inexpensive as possible.
The part awaiting to be installed are:
2 HighPress BG14 (HLT and BOIL)
1 LowPress 6" 70kbtu (mash tun)
1 HighPress regulator
Here what my stand looks like currently. Help me finish please! ;-)
I need recommendations on regulators, line size, needle valves and any other (non-expensive) additions you think are mandatory. Basically, what would you do, within reason, to finish this. Thanks for any help guys.