optimatored
Well-Known Member
I have been going back and forth...
1.) Build a nice housing for my keezer, wood, tile top... something nice.
2.) Put the keezer down in my basement and run lines up to my family room (yes wife is on board)...
The lines would have to be pretty long... lets say at least 15ft. So before I can decide, can anyone help to brainstorm any potential issues with option 2? I know keeping the lines cold is one, but how about pressure, and moving the beer about 15-20ft? How can I keep beer cold in the line and out the tap?
Any help is always appreciated!! Thanks.
1.) Build a nice housing for my keezer, wood, tile top... something nice.
2.) Put the keezer down in my basement and run lines up to my family room (yes wife is on board)...
The lines would have to be pretty long... lets say at least 15ft. So before I can decide, can anyone help to brainstorm any potential issues with option 2? I know keeping the lines cold is one, but how about pressure, and moving the beer about 15-20ft? How can I keep beer cold in the line and out the tap?
Any help is always appreciated!! Thanks.