Hey Guys,
I have the majority of my electric build on order and im looking at running this off of a 50amp breaker. I have the receptacle in place as well. I'd like to run 2 Elements at the same time, 4500w for HLT, and a 5500w for BK.
Ill also be running the BCS, and 1 pump.
I see that you can purchase "Power Switch Tail 2" - is that pretty much the standard im assuming to power the BCS?
if so, I would like to have the (3) 110 outlets to run the laptop, pump, and the bcs right on the brew rig to eliminate wires on the ground.
Can anyone link me to a similar wiring diagram?
Thanks
I have the majority of my electric build on order and im looking at running this off of a 50amp breaker. I have the receptacle in place as well. I'd like to run 2 Elements at the same time, 4500w for HLT, and a 5500w for BK.
Ill also be running the BCS, and 1 pump.
I see that you can purchase "Power Switch Tail 2" - is that pretty much the standard im assuming to power the BCS?
if so, I would like to have the (3) 110 outlets to run the laptop, pump, and the bcs right on the brew rig to eliminate wires on the ground.
Can anyone link me to a similar wiring diagram?
Thanks