jlandin
Well-Known Member
That brass hex bushing is NPT to NPT right? You have that screwed onto the orifice fitting, which is flare.
--
Josh
--
Josh
That brass hex bushing is NPT to NPT right? You have that screwed onto the orifice fitting, which is flare.
--
Josh
I used some pipe dope.
The gas hookup between the valve and orifice was a sticking point for my build as well.
Not nearly as pretty as yours, but being my first welding adventure, I am very proud. Thank you for your tools/parts/dimensions list, and inspiring me to take this on. Still more to do, but nice to see it taking shape.
Please forgive the mess........
I had a question on the gas flexible hose. If the hookup on the hose is going directly out of the burner, is there any pressure built-up? If no pressure is built-up, then the .5 psi gas hose might work?
I know you answered this a few pages back, but I just wanted to be sure I read it correctly. In regards to the 1200 degree paint, is it holding up just fine, especially areas that are in direct contact with the flames?
Thanks again!
Yes, I dont have any problems with the paint..even after heating up my strike water and boiling the wort for 90 min..not a problem..
Direct flame not a problem.
What temp is the red paint you're using? Also do you think you needed to go that far down the tubing with the red paint? I am using 2000F paint for the top (your stand is the blueprint I used) and 500F yellow paint for the rest of the stand. I would like to go as high up as possible without burning the paint up. Do you think your stand gets 500F just a few inches down from the top?