Well I got much accomplished on my build today! Cut out all the holes needed for the kegs, HLT and BK, mounted all the SS bling, and cut the holes for the outlets on the control box, leak tested the kegs, and everything is starting to look good and come together. Getting very excited. Will work on the control panel more tomorrow and maybe will be ready to start wiring next weekend!
Measure three times drill once.
Step bit worked great for all the holes, used a cheap set from Harbor Frieght.
The Barney Mobile in the back ground, used a friend garage since he has all the cool tools, then we worked on his car
Outlets for Chugger Pumps.
Brew Kettle
Inside BK
Hot Liquor Tank
Inside HLT
Starting to look like a brewery
The outlets on control panel.
Leak testing, added 5 gallons of water to check all but the top outlets, everything looks good so far.
The look of things to come, no the control panel won't be sitting on the MT, nor will the wife let me keep it set up on the kitchen island, and yes I still need to put the elements into boxes mounted on the side of the kegs.
Measure three times drill once.
Step bit worked great for all the holes, used a cheap set from Harbor Frieght.
The Barney Mobile in the back ground, used a friend garage since he has all the cool tools, then we worked on his car
Outlets for Chugger Pumps.
Brew Kettle
Inside BK
Hot Liquor Tank
Inside HLT
Starting to look like a brewery
The outlets on control panel.
Leak testing, added 5 gallons of water to check all but the top outlets, everything looks good so far.
The look of things to come, no the control panel won't be sitting on the MT, nor will the wife let me keep it set up on the kitchen island, and yes I still need to put the elements into boxes mounted on the side of the kegs.