Just reading this and wanted to ask, since my Czech Lager is in primary. I currently have a bubble per second from a blow off tube (Can't use an airlock due to the height of my fermentation/lager chamber). I had a three day lag on start-up at 53*F.
So, does the 10 days include the lag? Also, when I raise the temps to do the D-rest, should I raise it a few degrees at a time over a certain period or just increase all at once. I have the capability to increase by one degree or more up to four times per day. It is a programmable thermostatically controlled chamber.
My LHBS guy recommended to just move it to a warm room, but since I have the chamber I can control it much more accurately.
Thanks for your comments and wisdom in advance.