mike11b82
Well-Known Member
So I'm building a control panel with on of PJs diagrams. A one PID controlling two elements. I'm kind of concerned about the 3 way switch I have controlling the large amount of power for the elements. I noticed that Kal uses relays and I'm wondering if I should do the same. Thanks for the help