OK..
I have been through a lot of threads here getting some ideas. I'm working with somewhat of a limited budget (I dont want to spend much more than 500 on the whole kegging system) so keep that in mind. I would like to have a tower, I plan on building a bar and would like to have the minifridge (probably looking at the Sanyo) I have a couple of questions....
1. How well does the Sanyo model everyone seems to be talking about actually work? Will it keep two kegs cold enough? I'm planning on have a dual tap and hopefully the ability to expand to three. I have heard that the Sanyo can fit three cornelius kegs and the CO2 tank, did I hear right?
2. How important is it that I keep my towers chilled? I am planning to build a bar, and wanted to somehow run the towers through the bar and put the taps on top... is this even possible? If I did this, I am assuming I would have to keep those towers chilled, is it possible to build some sort of little cooling system for a small area to keep the taps chilled?
I know its a bit ambitious to start out with, but I figure if I do it once, I should do it well and make something I can use the rest of my life rather than some rinky dink thing I am gonna want to upgrade in 10 years.
I have been through a lot of threads here getting some ideas. I'm working with somewhat of a limited budget (I dont want to spend much more than 500 on the whole kegging system) so keep that in mind. I would like to have a tower, I plan on building a bar and would like to have the minifridge (probably looking at the Sanyo) I have a couple of questions....
1. How well does the Sanyo model everyone seems to be talking about actually work? Will it keep two kegs cold enough? I'm planning on have a dual tap and hopefully the ability to expand to three. I have heard that the Sanyo can fit three cornelius kegs and the CO2 tank, did I hear right?
2. How important is it that I keep my towers chilled? I am planning to build a bar, and wanted to somehow run the towers through the bar and put the taps on top... is this even possible? If I did this, I am assuming I would have to keep those towers chilled, is it possible to build some sort of little cooling system for a small area to keep the taps chilled?
I know its a bit ambitious to start out with, but I figure if I do it once, I should do it well and make something I can use the rest of my life rather than some rinky dink thing I am gonna want to upgrade in 10 years.