ScubaSteve
Well-Known Member
- Joined
- May 21, 2007
- Messages
- 3,673
- Reaction score
- 91
On the outside of this panel, I fastened my plumbing:
I chose to make it low so I could put my electronics high and avoid any dripping. I plan to run braided hoses from the barb fittings to my chiller, as well as a multi-purpose hose for quickly connecting to and blowing out clogs/flushing/cleaning the chiller, BK, and HLT.
Here's the quick connect I set up for my hose:
I plan to tweak this idea, because in actual practice the QD leaks like hell. Maybe I just need to buy a different model.
Here's a close up of the filter canister. I filter my water with a coarse filter, and use a shepherds hook to fill the HLT. I might consider hard plumbing this in the future:

I chose to make it low so I could put my electronics high and avoid any dripping. I plan to run braided hoses from the barb fittings to my chiller, as well as a multi-purpose hose for quickly connecting to and blowing out clogs/flushing/cleaning the chiller, BK, and HLT.
Here's the quick connect I set up for my hose:

I plan to tweak this idea, because in actual practice the QD leaks like hell. Maybe I just need to buy a different model.
Here's a close up of the filter canister. I filter my water with a coarse filter, and use a shepherds hook to fill the HLT. I might consider hard plumbing this in the future:
