I just finished brewing my first lager, and got the fermenter in the fridge. My goal was to pitch the yeast at 43 degrees, and let it rise to ferment temp of 49. My wort chiller only got me to 48, and it's unlikely the fridge will get me beyond 47 before I go to bed.
I have two options:
1) Pitch now, set the temp controller for 49 degrees, and let it go.
2) Wait until morning, when I'll probably be down to 43, pitch, and let it rise to 49 as planned.
Any pros/cons to either?
I have two options:
1) Pitch now, set the temp controller for 49 degrees, and let it go.
2) Wait until morning, when I'll probably be down to 43, pitch, and let it rise to 49 as planned.
Any pros/cons to either?