cheez
Well-Known Member
I am on the last leg of my Stout Tanks 50-amp control panel build (see build thread here - https://www.homebrewtalk.com/f170/e-herms-build-50-amp-393717/)
I am having a tough time figuring out how to run the two element power cables, two pump power cables, and the three RTD sensor cables from the control panel, along the back side of my brew stand, to the kettles without it looking to ugly and dangly. This will be a mobile stand so I can't just attach the cables to a wall.
I'm also trying to figure out how to run a water line on the back side and up and over the top of the BK and HLT for easy filling. It would be nice to use cheap CPVC and drop the pipes down into the kettles a few inches but then I couldn't use the lids.
Does anyone have any thoughts, pictures, etc.?
Thanks
I am having a tough time figuring out how to run the two element power cables, two pump power cables, and the three RTD sensor cables from the control panel, along the back side of my brew stand, to the kettles without it looking to ugly and dangly. This will be a mobile stand so I can't just attach the cables to a wall.
I'm also trying to figure out how to run a water line on the back side and up and over the top of the BK and HLT for easy filling. It would be nice to use cheap CPVC and drop the pipes down into the kettles a few inches but then I couldn't use the lids.
Does anyone have any thoughts, pictures, etc.?
Thanks