Desert_Sky
Since 1998
well I spent all day today getting the kegs ready. Got a fitting welded on to my false bottom and everything leak tested. I think instead of a box of some sort Im going to use a 1/16 thick piece of sheet metal and just make my control panel out of that.
With that said.....I cant do any testing on the burners and pilots until I get power to the solenoids to open the flow.
Been giving some more thought to what kladue said about watching the temp. Who knows, by the time this is all said and done I may just go with some needle valves for a more precise manual control over all three burners.
I haven't gone this long without my beer in the fridge and am starting to get anxious. Boddington's is filling the void tonight though.
With that said.....I cant do any testing on the burners and pilots until I get power to the solenoids to open the flow.
Been giving some more thought to what kladue said about watching the temp. Who knows, by the time this is all said and done I may just go with some needle valves for a more precise manual control over all three burners.
I haven't gone this long without my beer in the fridge and am starting to get anxious. Boddington's is filling the void tonight though.