Desert_Sky
Since 1998
Wow....its been a long road with this build, but I can finally see the light at the end of the tunnel.
Its nothing fancy. We mostly followed Lonnie's plans and added a few changes as we went along. The frame and the kegs we all TIG welded so it took a bit longer, but the final product looks amazing. Standard 2 x 2 x.120 square tube steel. No stainless steel since it would of been about 1k more for materials alone.
Here it is at being put together. And jigs have been made just in case we want to make anymore
Heres a shot of those beautiful TIG welds. I need a better camera really bad
Heres a little change we came up with. THe control box arm is on a hinge that can be folded up for storage.
Its nothing fancy. We mostly followed Lonnie's plans and added a few changes as we went along. The frame and the kegs we all TIG welded so it took a bit longer, but the final product looks amazing. Standard 2 x 2 x.120 square tube steel. No stainless steel since it would of been about 1k more for materials alone.
Here it is at being put together. And jigs have been made just in case we want to make anymore
Heres a shot of those beautiful TIG welds. I need a better camera really bad
Heres a little change we came up with. THe control box arm is on a hinge that can be folded up for storage.