Alright, its been 5 months since an update... the new house is pretty much done, but a new woman in the life has kept me from finishing. Progress has been made however.
All 4 vessels of the system are complete
Frame is complete with casters
24 gallon conical is complete... gasketed with lid secured, just need to test.
Built a stirplate and aquired some flasks / stirbars
Whats left?
Plumb the burners
Finish the grain mill.
I'm so close.... plumbing the burners is going to be a PITA as I need to do it in pipe. I've got a 1" line coming from my propane tank out back, so I'd like to keep at least 3/4" to the 300,000 btu burners.
soooo close. :rockin:
All 4 vessels of the system are complete
Frame is complete with casters
24 gallon conical is complete... gasketed with lid secured, just need to test.
Built a stirplate and aquired some flasks / stirbars
Whats left?
Plumb the burners
Finish the grain mill.
I'm so close.... plumbing the burners is going to be a PITA as I need to do it in pipe. I've got a 1" line coming from my propane tank out back, so I'd like to keep at least 3/4" to the 300,000 btu burners.
soooo close. :rockin: