Moccasin Brewer
Member
- Joined
- Aug 5, 2019
- Messages
- 5
- Reaction score
- 0
I am in the process of coming up with my own controller and came up with a wiring diagram pictured below. The thing that is different here than most controllers is that I want to use a typical welder outlet that is 240V with 3 prongs. In order to get my 120V line into the controller box I am also going to put a 120V plug on the box as well so I can also control my pump. This, in my opinion will give me the Neutral line that I need that you would typically get with a 4 prong 240V outlet like a drier plug. I'm only using one PID and one heating element because I just use one kettle for my HLT and boil kettle.
I think this will work, if you don't think it will give me an explanation as of why. I'm not too concerned about the electrical code because I am just going to use a spa panel and wire it so I can plug it into the welding outlet that I have available so it will be "portable" in a sense. Also, FYI, all the wires will be sized appropriately.
Let me know what you think, if it will work or if it wont. Like I said if it wont work, tell me why.
I think this will work, if you don't think it will give me an explanation as of why. I'm not too concerned about the electrical code because I am just going to use a spa panel and wire it so I can plug it into the welding outlet that I have available so it will be "portable" in a sense. Also, FYI, all the wires will be sized appropriately.
Let me know what you think, if it will work or if it wont. Like I said if it wont work, tell me why.