snowtires
Well-Known Member
- Joined
- Sep 7, 2012
- Messages
- 621
- Reaction score
- 92
I just did my first ebiab doughing in at 40c, ramping to a protein rest, then ramping up to the main event. This was also the very first time with the new system so the clean up wasn't efficient. Total time was just under 4 hours from crushing grain to final cleanup. I would imagine i could do this in 3 once i get it down. The electric 5500w heat is like a dream, beating me to dough in temperature and a boil before I'm ready.