• Please visit and share your knowledge at our sister communities:
  • If you have not, please join our official Homebrewing Facebook Group!

    Homebrewing Facebook Group

Duotight regulator board question

Homebrew Talk

Help Support Homebrew Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

T Murph

Homebrew Advocate
HBT Supporter
Joined
Mar 19, 2021
Messages
1,598
Reaction score
4,107
Location
Cullman
I purchased the 6 port Duotight regulator board with valves. In the instruction picture they have the Ts at top, then the valve before the regulator and finally the check vavle. All connections are shown as about 3 inches. Then on the keg side you are to use the necessary lenght of line to reach your kegs. See picture below.
20250527_211045.jpg

My question is why can't I put the shut off valve and the check valve close to the end right before the quick connect? Anyone who uses one of these boards please share your experience and opinion.
 
The regulators were the culprit for MANY leaks in my system - I had s/o valves positioned before them to help isolate the leaks before I was able to replace them. In addition to adding shutoff valves to the keg ends of my gas lines, I also added additional guages at the keg end to fine tune the super unreliable duotight regulators.
 
If you put the shutoff valve and check valve close to the QD, they would not be mounted. They would move around possibly and create strain on the fitting.

If you put the shutoff and check valve after the regulator, the regulator is subject to pressure all the time. This is probably a minor consideration in most cases.

On the Taprite, the tee is internal by design. I don't know if there might be a reason for that beyond saving a fitting. Having the check valve inside the shutoff also saves a fitting. Then the shutoff valve should be after to prevent backflow to the regulator.
 
Back
Top