wapitiscat
Well-Known Member
I'm starting to gather the pieces for an electric HLT setup that will expand to include and electric BK later. Overall, I'm interested in control and improved efficiency (time and power source) more than automation. I've got 220 wired in the garage, spa panel is on the way, etc. I haven't settled on an enclosure yet. What I'm not sure about is which parts and pieces I need to get the HLT control going. I'll follow one of P-J's schematics to power two 5500 watt elements with one PID, one temperature probe and one pump for now. Ignoring things like receptacles, power cords, lights and buzzers and such, how does this sound?
SYL 2352 PID
(2) Contactors, 2 pole, 30 amp, 120V coil
40 amp SSR plus heatsink
Temperature probe and probe connection (going with the 4" RTD)
SW6 for the E-stop
SW8 3 position for switching elements
I'm getting to a flatter part of the learning curve on this and look forward to concentrating more on the brewing itself.
Todd
SYL 2352 PID
(2) Contactors, 2 pole, 30 amp, 120V coil
40 amp SSR plus heatsink
Temperature probe and probe connection (going with the 4" RTD)
SW6 for the E-stop
SW8 3 position for switching elements
I'm getting to a flatter part of the learning curve on this and look forward to concentrating more on the brewing itself.
Todd