Well I've been toying with this design and collecting parts for a couple of years and finally started building it. Here is the Sketchup design I'm working to. I can add pics if anyone is interested or has questions. I'm open to suggestions too. So far I have the steel frame welded and the keggles mounted to hinged bases as shown in the image. Hinges not visible.
Keggles rotate out and down for cleaning, hoist has a custom 400 micron basket for Brew-in-a-Basket approach. I still need to order the basket. Right keggle is for heating water, left keggle is for mashing, sparging, and brewing. In the center is my 14.5 gallon ferminator. After chilling and pitching the ferminator will be moved to a temp controlled fridge I bought second hand. There is a food-grade pump and a heat exchanger, and I have a submersible non-food-grade pump not shown to circulate cooling water through the heat exchanger. Banjo burners with heat shields hard to see in the drawing. One propane tank will have a dual feed one to each burner. What do you guys think?
Keggles rotate out and down for cleaning, hoist has a custom 400 micron basket for Brew-in-a-Basket approach. I still need to order the basket. Right keggle is for heating water, left keggle is for mashing, sparging, and brewing. In the center is my 14.5 gallon ferminator. After chilling and pitching the ferminator will be moved to a temp controlled fridge I bought second hand. There is a food-grade pump and a heat exchanger, and I have a submersible non-food-grade pump not shown to circulate cooling water through the heat exchanger. Banjo burners with heat shields hard to see in the drawing. One propane tank will have a dual feed one to each burner. What do you guys think?