iijakii
Well-Known Member
Overview of BK. Far left is the sightglass. I still need to calibrate and put the volume stickers on. Then there's the wort-return and the bottom valve is wort-out.
Whirlpool (wort-in) fitting and RTD probe.
Side pickup diptube in the BK. Need to shorten it a quarter-half inch or so.
RTD probe connected to sightglass T:
Distance between BK and MT is quite short, going to be pretty lol having camlocks that close. (still need a washer, so MT camlock isn't tightened)
Mash tun. False bottom and a loc-line sparge arm. Baller status.

Whirlpool (wort-in) fitting and RTD probe.

Side pickup diptube in the BK. Need to shorten it a quarter-half inch or so.

RTD probe connected to sightglass T:

Distance between BK and MT is quite short, going to be pretty lol having camlocks that close. (still need a washer, so MT camlock isn't tightened)

Mash tun. False bottom and a loc-line sparge arm. Baller status.
