I am finally getting my act together.
Cleared out an area in the garage for my brewing equipment, and when the brew rig is done I'll be able to brew in (well just outside) the garage and have everything I need right there. I'll be able to mill grain out there, fill water, clean carboys, etc. The stand will be welded this week and next weekend. That'll be the finisher. Then the brewery will be the way I want it until we buy our house and I have a dedicated room.
This effort will certainly be coming a LONG way from when I started though. :rockin:
The brew area (garage door is off to the right, and the stand will be rolled in and out:
The dedicated brewing/hop freezer (5.0 cubic feet chest freezer):
Cleared out an area in the garage for my brewing equipment, and when the brew rig is done I'll be able to brew in (well just outside) the garage and have everything I need right there. I'll be able to mill grain out there, fill water, clean carboys, etc. The stand will be welded this week and next weekend. That'll be the finisher. Then the brewery will be the way I want it until we buy our house and I have a dedicated room.
This effort will certainly be coming a LONG way from when I started though. :rockin:
The brew area (garage door is off to the right, and the stand will be rolled in and out:
The dedicated brewing/hop freezer (5.0 cubic feet chest freezer):