Huaco
Well-Known Member
I ran a "sample" run on my rig last night. I started building the brewery on April 1st. Who knew it would take 4 months to build a brewery! I have a few things left to do but the brewery is actually functional as-is.
Control Panel under full load.
I have some small water leaks here and there with my camlocks but nothing real bad. I will try to get them sealed up soon.
Set up for Mashing.
Pumps (Please excuse the saw-dust and wood chips)
Bottom drain HLT
False Bottom
Control Panel under full load.
I have some small water leaks here and there with my camlocks but nothing real bad. I will try to get them sealed up soon.
Set up for Mashing.
Pumps (Please excuse the saw-dust and wood chips)
Bottom drain HLT
False Bottom