Needed a home for my AG project. Here it is for now. Didn't realize how long (and expensive) this would end up being.
Here's the systems path:
Here's my newly completed bottom drain autosparge MT. Thanks to Jaybird for an awesome FB!
Here's my HERMS HLT also with bottom drain, still need to install my 5500W Element and Sight Glass/Thermometer combo:
Almost finished dual pump box:
STC-1000 dual stage DIY temp controller:
Ace Roto Plastic 15 gallon fermenter and stand:
The only image of my BK coupings soldered in. I'll take more pics when it's done.
My system plumping animation:
Here's the systems path:
Here's my newly completed bottom drain autosparge MT. Thanks to Jaybird for an awesome FB!
Here's my HERMS HLT also with bottom drain, still need to install my 5500W Element and Sight Glass/Thermometer combo:
Almost finished dual pump box:
STC-1000 dual stage DIY temp controller:
Ace Roto Plastic 15 gallon fermenter and stand:
The only image of my BK coupings soldered in. I'll take more pics when it's done.
My system plumping animation: