johnny1211
Member
- Joined
- Jun 10, 2013
- Messages
- 20
- Reaction score
- 1
I currently heat mash and sparge water on my stove, mash in a cooler and boil in a keggle over a propane burner. After much thought, I would like to get started with an electric system. Unfortunately, the cost of putting a full system together right now is not feasible. My question is this. Is it worth it to build an electric brew keggle now, continue to do everything else as is, and add to it (eHLT, eMLT, pumps, etc.) as money allows to create a full electric system, or is it better to wait and put a system all together at once? Thanks for the insight.