michgan241
Active Member
- Joined
- Dec 27, 2012
- Messages
- 38
- Reaction score
- 0
So I am a new brewer and i have pretty limited equiptment. I've got the NB 89$ kit with an extra ferm bucket and a better bottle 6.5. I'm really enjoying the brewing so far but I dont have nearly enough bottles stocked up and I'm already wanting to plan out more brews.
I've decided to allot 20-30$ a month to brewing gear and I was wondering in what order would you guys suggest i build?
Things I'd like to get are 30qt aluminum kettle, Ferm chamber with air conditioner, Mash Tun, Kegging set up, collection of bottles( i dont have nearly enough atm)
I've decided to allot 20-30$ a month to brewing gear and I was wondering in what order would you guys suggest i build?
Things I'd like to get are 30qt aluminum kettle, Ferm chamber with air conditioner, Mash Tun, Kegging set up, collection of bottles( i dont have nearly enough atm)