jordanpace
Well-Known Member
- Joined
- Sep 21, 2007
- Messages
- 264
- Reaction score
- 17
I have been building brewing sculpture the last few months but I am not having to get rid of it.
I am moving out of the country to study for 3 years and wont be needing a half finished sculpture sitting around.
It is basically a 20 gallon system.
The BK is a 25 gallon mega pot purchased off of northernbrewer.com awhile back and has a 1/2 coupler welded to the front and a 1/8 (i believe) coupler welded on the front for the thermometer.
The other 2 kettles are converted 15.5 sanke kegs, however they have not been drilled for holes (one does have a large hold drilled in for a heating element but the 1" coupler for it was never welded on).
I made the stand out of 1" square tubing and a mig welder.
The stand has 2 brand new March 809HS-PL pumps mounted and a Low Pressure Burner 103,000 BTUs Propane.
The rig was meant to be a HERMS system with a propane heated boil kettle.
It comes with a control box and a 1/16 DIN PID Temperature Controller (SSR control output) mounted.
I have a water filter halfway mounted at the moment and a half made wort chiller.
I will even throw in a 6.5 gallon glass carboy and a maple mash paddle (purchased off of morebeer.com over 2 years ago).
It is also mounted on wheels and rolls like a dream on a level surface.
Here are the pictures...
$700 takes everything. (i've seen these types of stands go for almost 1k)
I am located near the DFW.
PM if interested. By the way this is a local pick up only, thx.
I am moving out of the country to study for 3 years and wont be needing a half finished sculpture sitting around.
It is basically a 20 gallon system.
The BK is a 25 gallon mega pot purchased off of northernbrewer.com awhile back and has a 1/2 coupler welded to the front and a 1/8 (i believe) coupler welded on the front for the thermometer.
The other 2 kettles are converted 15.5 sanke kegs, however they have not been drilled for holes (one does have a large hold drilled in for a heating element but the 1" coupler for it was never welded on).
I made the stand out of 1" square tubing and a mig welder.
The stand has 2 brand new March 809HS-PL pumps mounted and a Low Pressure Burner 103,000 BTUs Propane.
The rig was meant to be a HERMS system with a propane heated boil kettle.
It comes with a control box and a 1/16 DIN PID Temperature Controller (SSR control output) mounted.
I have a water filter halfway mounted at the moment and a half made wort chiller.
I will even throw in a 6.5 gallon glass carboy and a maple mash paddle (purchased off of morebeer.com over 2 years ago).
It is also mounted on wheels and rolls like a dream on a level surface.
Here are the pictures...
$700 takes everything. (i've seen these types of stands go for almost 1k)
I am located near the DFW.
PM if interested. By the way this is a local pick up only, thx.