GrandRiverZip
Member
I have folks coming over on April 2nd, and I have 3 beers I'd like to bottle before then.
Beer 1 is a Scottish 80- and was brewed 2/20/11. Was in Primary for 2 weeks, then secondary on 3/5.
Beer 2 is a small batch of leftovers, Kinda a IIPA. Brewed on 2/28/11 racked to Secondary and dry hopped on 3/12/11.
Beer 3 is EdWort's Pale Ale, brewed on 3/5/11. Dry hopped in Primary on 3/12/11.
So my question is when should I bottle each. I'd love to have all of them ready for 4/2/11, but don't want to at the expense of poor beer. I figure IF I am going to get them in bottles it has to happen by 3/19/11 at the very latest.
Ideas?
Beer 1 is a Scottish 80- and was brewed 2/20/11. Was in Primary for 2 weeks, then secondary on 3/5.
Beer 2 is a small batch of leftovers, Kinda a IIPA. Brewed on 2/28/11 racked to Secondary and dry hopped on 3/12/11.
Beer 3 is EdWort's Pale Ale, brewed on 3/5/11. Dry hopped in Primary on 3/12/11.
So my question is when should I bottle each. I'd love to have all of them ready for 4/2/11, but don't want to at the expense of poor beer. I figure IF I am going to get them in bottles it has to happen by 3/19/11 at the very latest.
Ideas?