Hey guys-
I've been scouring the wiring diagrams in the P-J thread and don't see one that shows what I'm trying to do and its making me wonder if the way I'm planning my setup is out of the ordinary.
I'm trying to control an HLT and a RIMS tube. Leave the boil kettle out of the process because I have that squared away already.
-I have a 5500W 240V element installed in the HLT that will run at 240V
-I have a 5500W 240V element installed in an 18" RIMS tube that I want to run at 110V
-I have 2 pumps
-I would like to use Auber PIDS, 2 of them. One for each element.
I have 50Amp service available and require the use of both elements at the same time so I can be mashing in and heating sparge water concurrently.
Is anyone else doing something like this or am I nuts?
Thank you.
Jim
I've been scouring the wiring diagrams in the P-J thread and don't see one that shows what I'm trying to do and its making me wonder if the way I'm planning my setup is out of the ordinary.
I'm trying to control an HLT and a RIMS tube. Leave the boil kettle out of the process because I have that squared away already.
-I have a 5500W 240V element installed in the HLT that will run at 240V
-I have a 5500W 240V element installed in an 18" RIMS tube that I want to run at 110V
-I have 2 pumps
-I would like to use Auber PIDS, 2 of them. One for each element.
I have 50Amp service available and require the use of both elements at the same time so I can be mashing in and heating sparge water concurrently.
Is anyone else doing something like this or am I nuts?
Thank you.
Jim