I've started slowly building my control panel using a NEMA 12x12x6 steel box. the plan is to have a 4 wire dryer out let provide the main power, from a 4 wire 30A 250VAC GFI protected cord. For now I will be using propane for the boil, but eventually I want to run all electric. The control panel will for now just be running the 5K watt heating element in the HLT, and the two pumps.
As of right now I have laid it all out and it will all fit, but its going to be tight. I have started cutting the box for the receptacles, and have marked the positions for the switched. so more pictures to follow.