Hikeon3
Well-Known Member
So I've bottled four batches of extract brew so I'm very much still a newbie. But four times bottling 5-5.5 gallon batches has already tossed me onto the kegging bandwagon. So I caved and decided to use my 300 dollar "stimulus check" to stimulate some economic growth.
Ordered a 4-pack of unrebuilt corny kegs from morebeer.com. I'm assuming they come with many of the necessary pieces for keg operation (the posts fully assembled etc) so I was planning on getting new o-rings, gaskets, and poppits for them. But I don't know what parts I'll need to actually operate the kegs.
I know a CO2 tank is necessary, but then I need a pressure regulator of some sort and lines for gas in and beer out. And fittings for the lines, and a faucet. I don't know exactly what all four unreconditioned kegs are going to need. Can anyone give me a rough listing of parts that I should pick up for rebuilding/operating these kegs?
Thanks much.
(P.S. searched a few times on the topic, but didn't find any extensive listings that a complete n00b like myself would require. I'm not lazy, just very ignorant.)
Ordered a 4-pack of unrebuilt corny kegs from morebeer.com. I'm assuming they come with many of the necessary pieces for keg operation (the posts fully assembled etc) so I was planning on getting new o-rings, gaskets, and poppits for them. But I don't know what parts I'll need to actually operate the kegs.
I know a CO2 tank is necessary, but then I need a pressure regulator of some sort and lines for gas in and beer out. And fittings for the lines, and a faucet. I don't know exactly what all four unreconditioned kegs are going to need. Can anyone give me a rough listing of parts that I should pick up for rebuilding/operating these kegs?
Thanks much.
(P.S. searched a few times on the topic, but didn't find any extensive listings that a complete n00b like myself would require. I'm not lazy, just very ignorant.)