I've got all of my kegs and most of my fermenters full now so I need to get back to this project. I've been just opening the lid using party taps to this point and bumping the CO2 hose from keg to keg as needed. I've already ordered my faucets. I actually have 2 CO2 tanks because I want to keep one in the keezer and one for carbing, cleaning, and backup. What materials am I going to need other than the collar build? I'm going to start with a 6 way manifold and see if I can live with one pressure for all beers for a while. I'm assuming I'll need beer and gas line. Should I buy this in a 50' spool, measure and get by the foot, buy pre-made lines with hardware already on them? What hardware will I need? Obviously I need 6 gas and beer line ball lock disconnects because this is a 6 keg system. What about hardware for mounting the faucets and installing and connecting to the shanks? Does anyone have a method of running the lines that they think would work best for this setup? I'm connecting the collar to the lid so that the faucets swing up when I open it but still want to have the lines out of the way so that it's easy to swap out kegs. Are wingnuts much more convenient than hexnuts? What else am I forgetting here?