I, recently finding myself as a poor college student after selling my business and opting for a career change, had to make a decision... wait to build my brew rig, or use what I have to get it done.
In the spirit of masterful creations like the "brewflex," I present to you, my new brewing system... The BrewGuard
Well at leased it will be. This is a photo of the Weather Guard Ladder rack that I had on my truck before I sold my business. I opted to keep it for the steel rather than sell a used rack.
I'm not finished with my rig yet, but here are the build photos so far:
Day one (basic frame)
These are the side rails that will make up the main frame:
Welding the rails together:
Day two (upper deck)
I'm planning on continuing to use my Herms system, with a gravity fed MLT, so I raised the HLT level which will also give me room for my pumps and valves, not to mention any future control devices.
In the spirit of masterful creations like the "brewflex," I present to you, my new brewing system... The BrewGuard
Well at leased it will be. This is a photo of the Weather Guard Ladder rack that I had on my truck before I sold my business. I opted to keep it for the steel rather than sell a used rack.
I'm not finished with my rig yet, but here are the build photos so far:
Day one (basic frame)
These are the side rails that will make up the main frame:
Welding the rails together:
Day two (upper deck)
I'm planning on continuing to use my Herms system, with a gravity fed MLT, so I raised the HLT level which will also give me room for my pumps and valves, not to mention any future control devices.