Have read all the forums and found a few that were adaptable (maybe/not). Here is what I have:
Source Main Panel:
30a, 240v, GFCI feeding a 10/3 + ground wire to a 30a, 240v Pass&Seymour locking outlet.
Control Box Components:
Buzzer, 120/240, FLBuz
Switch, 3 position, 2 NO, SW3 (Power to HLT and BK elements, 4500W, 240v) never on together
Power Light Indicator for HLT and BK elements, IND-1
PID, SYL2352
40A SSR
2 30A, 250V, DPDT, 120V Coil Contactor (HLT and BK)
Power Button (Push Button Illuminated) for Pump, SW11
Timer, ASL-51
Reset Button, Push Button Momentary, SW7
2 Female Pass&Seymour plugs for each element (30A, 240V, 3 Wire)
2 Female 120V plugs for Chugger Pump, 1.4A
1 RTD Sensor
All Buttons, switches, PID, Timer and SSR are from Auber.
Appreciate any help. Hope this is detailed enough.
Source Main Panel:
30a, 240v, GFCI feeding a 10/3 + ground wire to a 30a, 240v Pass&Seymour locking outlet.
Control Box Components:
Buzzer, 120/240, FLBuz
Switch, 3 position, 2 NO, SW3 (Power to HLT and BK elements, 4500W, 240v) never on together
Power Light Indicator for HLT and BK elements, IND-1
PID, SYL2352
40A SSR
2 30A, 250V, DPDT, 120V Coil Contactor (HLT and BK)
Power Button (Push Button Illuminated) for Pump, SW11
Timer, ASL-51
Reset Button, Push Button Momentary, SW7
2 Female Pass&Seymour plugs for each element (30A, 240V, 3 Wire)
2 Female 120V plugs for Chugger Pump, 1.4A
1 RTD Sensor
All Buttons, switches, PID, Timer and SSR are from Auber.
Appreciate any help. Hope this is detailed enough.