I'm almost done with a new bar ledge. So now I need to go from taps in the collar of my keezer to running them thru a wall. It's not far away, just keeping my keezer in a closet I built for it and running taps into a wall with a bar ledge and built in shelving to keep SWMBO happy.
Question is, what's the best way to do this? I have four taps. Should I use one big pvc tube thru the collar, run it to an insulated box on the wall, and put a fan in the keezer to blow air? Or should I use two smaller pvc tubes? Unfortunately, I had so much to do with building the walls, running electrical for my heat stick setup, etc, that I just made a quickie collar out of 2x4's. Not a lot of space there to drill a big hole for a larger pipe.
I will wrap pvc in insulation and I understand that I may have some first pour issues. Looking for ideas from the community, though! I was thinking of building something out of ducting materials from HD.
Thanks for the ideas. Cheers!:rockin:
Question is, what's the best way to do this? I have four taps. Should I use one big pvc tube thru the collar, run it to an insulated box on the wall, and put a fan in the keezer to blow air? Or should I use two smaller pvc tubes? Unfortunately, I had so much to do with building the walls, running electrical for my heat stick setup, etc, that I just made a quickie collar out of 2x4's. Not a lot of space there to drill a big hole for a larger pipe.
I will wrap pvc in insulation and I understand that I may have some first pour issues. Looking for ideas from the community, though! I was thinking of building something out of ducting materials from HD.
Thanks for the ideas. Cheers!:rockin: