BeerAg
Well-Known Member
I have a chest freezer with a collar I made, a new 20lb CO2 tank with regulator, and now I am going to put in the gas lines and taps. Let me know if I am missing something.
1)Gas line from tank to manifold: 6' of line, 2 clamps
2)4 way gas manifold
3)gas line from manifold to kegs (x4):4' gas line, 2 clamps, 1 gray ball lock quick connect with gas line barb
4)Beverage lines to taps(x4): 1 black ball lock quick connect, 4' tubing, 2 clamps
5)Taps (x4): 4" faucet shank with nipple, shank collar, faucet, faucet handle
Am I missing something? This seems to me like it should cover everything.
1)Gas line from tank to manifold: 6' of line, 2 clamps
2)4 way gas manifold
3)gas line from manifold to kegs (x4):4' gas line, 2 clamps, 1 gray ball lock quick connect with gas line barb
4)Beverage lines to taps(x4): 1 black ball lock quick connect, 4' tubing, 2 clamps
5)Taps (x4): 4" faucet shank with nipple, shank collar, faucet, faucet handle
Am I missing something? This seems to me like it should cover everything.