Just wondering if you have any pics or detailed tricks on how you did this. Would love to be able to do this.
I'm going to take pictures tonight when I finish the job up. Life gets in the way with the fun stuff sometimes.
As a detailed instruction:
With the original tower already off/removed:
1. remove 3 phillips head screws from the rear of unit holding the plastic top trim down
2. Once screws are removed, lift & push plastic top trim towards front of unit.
This removes the top plastic trim.
3. Place and center new tower over hole, mark screw holes. Drill small template holes.
4. place plastic top trim in line with the front fasteners and pull back locking trim into place.
5. Lifting up on the plastic trim from the rear, maneuver tower through the hole (pain in the butt!) and place on to template holes.
6. Screw in using sheet metal screws. I screwed them in hand tight using thumb and forefinger, then used an offset screwdriver to tighten down.
7. Profit.
On a side note, the stuff included with this cooler is junk (IMHO). The Sanke tap looks sketchy as well, but I'm going to use it with some modification. The goal is to have 2 ball locks, and a standby sanke, so I picked up the stuff I needed and should be able to get everything configured and put together tonight. I'm taking my time to get this 100% right the first time.....