ngenerator
Member
- Joined
- Jul 12, 2019
- Messages
- 9
- Reaction score
- 0
Hi friends. I'm moving to eBIAB from propane BIAB and planning on how to run my wiring. I based my skeleton on morbster's version of the incomparable doug293cz's design.
Main difference is scrapping the alarm/switch combo, using a DSPR120, and adding an E-stop, fan/switch, and Volt/Amp meter.
I'm thinking I need to add a fuse and resistors on LINE1 before the E-stop, but other than that, what do you think?
Main difference is scrapping the alarm/switch combo, using a DSPR120, and adding an E-stop, fan/switch, and Volt/Amp meter.
I'm thinking I need to add a fuse and resistors on LINE1 before the E-stop, but other than that, what do you think?
