Got to say, I am pretty impressed and very happy I pulled the trigger on this bad boy. The electrician was here this morning to install my new breaker and outlet. As soon as he left, I filled up the kettle to the 10 gallon mark, bigger than anything I've brewed so far. I got to mash in temps in 30 minutes without a lid on. Then from there to rolling boil (with the lid on as it heated up) in another 30 minutes. Right now I am testing my 60 minute boil off values, and doing the happy dance.