Ok, I had a thread going, but for whatever reason the title wouldn't change so I'm going to start it clean.
I've got keggles set up weldless, I got the elements (2 5500 W) for Christmas last year and have been sitting on them all year. Finally got the electrician to come out Sunday and put a 100 Amp subpanel in the garage and set up the 50 Amp for starting the electric brewery. I'm going BCS as my WHOLE family no longer calls me for anything but Tech Support which is ok. I have the spare parts to build a small pc right next to the brewery to run everything and I'm going with PJ's design (huge thanks for everything you do for the electric guys) for the one below. That makes this just another build, but I'm going to try and document as best as possible.
I did have a question about what gauge wires for inside the box. I know they range greatly based upon the loads carried but I want to make sure I order enough of each gauge so I'm not running out to get more mid-build.
Thanks for all the help.
I've got keggles set up weldless, I got the elements (2 5500 W) for Christmas last year and have been sitting on them all year. Finally got the electrician to come out Sunday and put a 100 Amp subpanel in the garage and set up the 50 Amp for starting the electric brewery. I'm going BCS as my WHOLE family no longer calls me for anything but Tech Support which is ok. I have the spare parts to build a small pc right next to the brewery to run everything and I'm going with PJ's design (huge thanks for everything you do for the electric guys) for the one below. That makes this just another build, but I'm going to try and document as best as possible.
I did have a question about what gauge wires for inside the box. I know they range greatly based upon the loads carried but I want to make sure I order enough of each gauge so I'm not running out to get more mid-build.
Thanks for all the help.