• Please visit and share your knowledge at our sister communities:
  • If you have not, please join our official Homebrewing Facebook Group!

    Homebrewing Facebook Group

Totally building an electric biab system

Homebrew Talk

Help Support Homebrew Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Right! I totally forgot that the circuit there would be different once the element is plugged in. I am OK with it pulsing and just want it to reflect the element state.

I will wait to see how it looks during the first firing test after the wet test. Can hardly wait.

Thanks again for the help!
 
Do not put a small resistor in parallel with the indicator light(s), it will burn up relatively quickly when the element SSR actually turns on. And they smell really bad when they burn. The element is a "small" resistor as far as resistance value. A 5500W element has a nominal resistance of 10.5 ohms.

Brew on :mug:

Thanks for jumping in Doug, although I am a bit curious now...

To fix the LED couldn't you use a 1watt 100k resistor across the 240?
 
Thanks for jumping in Doug, although I am a bit curious now...

To fix the LED couldn't you use a 1watt 100k resistor across the 240?

Without knowing the detailed IV characteristics of the LED lamp, you don't really know what value of resistor to use. 100K might do it, or it might not (and 100K is not a "small" resistance.) In any case, once you understand that it is an artifact of not having the element connected, it isn't a problem that needs to be solved.

Brew on :mug:
 
Without knowing the detailed IV characteristics of the LED lamp, you don't really know what value of resistor to use. 100K might do it, or it might not (and 100K is not a "small" resistance.) In any case, once you understand that it is an artifact of not having the element connected, it isn't a problem that needs to be solved.

Brew on :mug:

Very true, and you're quite right, my brain was thinking physically small.

Much better to just consider the half-lit indicator as a signal that you forgot to plug in your element :D
 
Got over my nervousness to drill holes in the side of my precious 15 gallon Ss Brewtech kettle.

Using the 9/64 carbide bit as a pilot bit along with a step bit for the temp probe and the 40mm Tungsten Carbide tipped hole saw made quick work of the holes. Super happy with the tools from BrewHardware for this build.

At this point I believe I have everything done and should be able to assemble everything and go for a wet leak test.

I guess one more thing I still need to sort out is how to hang the ratchet pulley that I got with my bag from The Brew Bag.

Another couple test fit shots.


O1YLbyO.jpg


cN1ArOJ.jpg
 
I have been busy but I had time to run an overnight leak test, filled kettle with 6 gallons above the whirlpool port and left it. Sitting on paper towel to better see any drips that may have happened overnight. The paper was clean in the morning, yay it seems to be sealed.

Later I hooked my pump first up to the kettle output and to the recirculation port in the lid and ran it for 10 mins then hooked it to the whirlpool port and ran it again for 10 mins. All ports seem to be working just fine.

Pumped all the water out and hopefully tomorrow I will replace the TC cap currently on there with the actual heating element. Then test heating some water and take some timings to mash and boil temps.

I have been reading over some of the other threads on eye bolts and how best to mount my ratchet pulley.
 
Filled the kettle to 8 gallons of water at roughly 15°C (60°F)

Raised it to 65°C (150°F) my test mash temperature in 22 minutes.

Left that to circulate for a while to see how it held and it was pretty good, I am happy with the ezboil so far.

Then I set it to boil mode and raised it up to boiling which took another 15 minutes.

I am VERY happy with the times, and so glad that I went all the way to build a 240V system. One of my big reasons to move to this ebiab system is to shave time off my brew day. I believe I will start looking into 45min or even less mash and boils soon as well.

I will continue to post any system updates and my first actual brew day, hopefully soon! Still need to sort out that darn ratchet pulley...


Edit:

Forgot to mention, the element light works perfectly and as expected with the element attached. Thanks everyone.
 
Last edited:
One of my big reasons to move to this ebiab system is to shave time off my brew day.

My favorite part about electric is the ability to ignore it during the brew day. I can set it to strike temperature before I start and then not worry if I get distracted, the water will be waiting for me whenever I've got the grain milled.

Same for the mash if you are able to get a stable recirculation going.
 
Still have to build up my table/stand and a few other things to keep things organized and going smooth on my brew days.

Today I will mostly be cleaning, my build took over much of my brewing areas and my keezer is covered in power tools, drill bits, files and bits of wire. Hopefully I will find time to get a brew going very soon to take the new system for a spin!

I will likely do an initial brew as things look below though since I can hardly wait.

A quick shot of the first water run test.

vtGJUZM.jpg
 
I like the one temperature probe idea. I am still contemplating modifying my setup to go that direction.

I also wish I knew about the solderless tri-clamp fitting at brew hardware, I would have used that for the element.

Looking good!
 
Nice build! Would you be able to post the parts list and your final wiring schematic? I would love to build something like this but very limited in wiring skill. Thanks!!!
 
Nice build! Would you be able to post the parts list and your final wiring schematic? I would love to build something like this but very limited in wiring skill. Thanks!!!

I don't have much in the way of a parts list but I kept the wiring diagrams in this thread up to date as things changed and they are currently exactly the way it is now wired.

One picture I forgot to add is the cleaned up wiring in the panel, just wrapped things up with zip ties as I had planned.

More importantly! I still have not brewed on the system yet! I have done a few strike water and boil temp timings but that is all so far. Life happened and our second kid arrived so that has been taking a "little" bit of my time. Hope to be brewing soon though.

zY9LGik.jpg
 
Nice build, So much has advanced in the e-Brewing field since I started my build 3 or 4 years ago.

1) I like the way you mounted you element with the TC. (I mounted mine Kal style with a outdoor box except its a single gang instead of double gang)

2) I love that Auber came out with the EZ Boil, If I was building a panel today I think I would use this over the PID

3) I like the simplicity of your design, I do have a few extra components like a Emergency Stop and DIN Mounted Contractors and DIN Mounted breakers

4) I like that you put an Elbow on the lid for re-circulation (I might have to borrow that Idea to remove strain from return line.

5) Your ripple Element appears to be totally stainless.

Can't wait to hear how you first brew session with it goes.
 
Well as with many of us, a bit of life happened and it was not until a few weeks ago that I could finally brew on the new setup.

Brewed up a session blonde ale, and it was probably my smoothest brew day ever.

Roughly 16 minutes to go from 63F to 150F to mash in, and another 16 minutes to take it from 150F to boiling. Couldn't be more pleased with those times.

Only a few minor things.

My immersion chiller is fairly tall since I originally got it for this 15 gallon kettle to do both 5 and 10 gallon batches. Now it doesn't sit on the bottom, actually I had it sitting on my false bottom so it's not on the element. Most of it is really out of the wort now, not sure how i'm going to deal with that but I am really considering moving to a counterflow chiller. Chilling time was not horrible but much slower than it was before when it could sit on the bottom.

The elbow on my lid connection would not stop leaking so its a vertical connection for this brew, I have since remedied that and it connects at the proper angle again without the hose bending at an angle.

So happy to have gone electric!


Just mashed in about to give a stir, put in the recirc attachment and close the lid.

SypyXXb.jpg


System is so compact yet super powerful, I am very happy with my brew days.

gLW569M.jpg


Boil complete, just threw the chiller in about to shut off the elements and start chilling.

iybaHj5.jpg
 
Looking great!

I personally remove my false bottom before the boil, and place the immersion chiller directly on the element. No issues for ~1.5 years now. Though my chiller is 25ft copper coil, so take that for what its worth.
 
Looking great!

I personally remove my false bottom before the boil, and place the immersion chiller directly on the element. No issues for ~1.5 years now. Though my chiller is 25ft copper coil, so take that for what its worth.

Thank you, I appreciate the comment. I just worry the weight of the 50ft stainless steel coil might be too much for the element or start torquing the weldless TC connection too much.

Either way I would like a shorter more condensed coil or maybe just think about a counterflow chiller. I have heard decent things about some of the counterflow chillers as far as time and not having the clogging issues that plate chillers have sometimes.

Not trying to start a chiller type war :) There are already enough of those here. Just thinking out loud about what I should do in my situation.
 
I ended up scrunching my 50' 1/2" copper immersion chiller down so that most of the coils were overlapped once or twice, that keeps most of it submerged, even when I only run 6g batches. If you were worried about the weight you could use stainless rods to make feet and attach them directly to the coil. I just set my heavy copper IC right on the element.

If I was buying again today I might go the counterflow route, mostly to let me keep the lid on during chilling/whirlpool. Since I already own the IC I have had a hard time justifying the new expense...
 
You could fairly easily make a copper IC that is customized for your 5gal batches, and keep your existing one for 10gal batches.

The designs that have a coil within a coil, or interleaved coils, might be the most appropriate, because more of the coil tubing can be down beneath the surface of the wort.
 
Another couple test fit shots.


O1YLbyO.jpg


cN1ArOJ.jpg
Could you please clarify how you attached the heating element. On one of the pictures above to looks like its a TC element, but later there is a nut. Did you use a weldless kit and if so how badly it deforms the pot when tightened? Thanks!
 
You are correct, that is the exact fitting that I used from brewhardware. I have taken it off once or twice since installing it and I have not noticed any deforming of the pot at all. I would think you would have to crank it down pretty tight to deform the pot. It seals great and was the perfect solution for my build.
 
I know you’re build has been done for a while now but I have been building mine for a few months now and have a question on your wiring schematic. Maybe it’s a question
I wanted to fully understand the schematic before ordering parts and starting to wire it up, after looking over the great schematics from @doug293cz I decided to redraw the one that fit the closest in an effort to better understand it as well as have a modifiable version in case I wanted changes. The most obvious being the DSPR120, and marking the exact parts I would be using.

I drew it using Gliffy Diagrams if anyone is interested, its a Chome App.
Gliffy Diagrams

r9qPSVh.jpg

I know you’re build has been done for a while now but I have been building mine for a few months and have a question on your wiring schematic. Maybe it’s a question for @doug293cz?
These LED indicator lights. Is there a specific reason you have the 220v one? In my mind you could wire it with 110 from the active side of the SSR to know it’s firing. Unless there is more information you get from having it wired with 220...🤔
 
I know you’re build has been done for a while now but I have been building mine for a few months now and have a question on your wiring schematic. Maybe it’s a question


I know you’re build has been done for a while now but I have been building mine for a few months and have a question on your wiring schematic. Maybe it’s a question for @doug293cz?
These LED indicator lights. Is there a specific reason you have the 220v one? In my mind you could wire it with 110 from the active side of the SSR to know it’s firing. Unless there is more information you get from having it wired with 220...🤔

I think the reason to use 220V is so if the SSR or contactor is stuck closed you have a good indicator of that.
 
I don't have much in the way of a parts list but I kept the wiring diagrams in this thread up to date as things changed and they are currently exactly the way it is now wired.

One picture I forgot to add is the cleaned up wiring in the panel, just wrapped things up with zip ties as I had planned.

More importantly! I still have not brewed on the system yet! I have done a few strike water and boil temp timings but that is all so far. Life happened and our second kid arrived so that has been taking a "little" bit of my time. Hope to be brewing soon though.

zY9LGik.jpg

Is it just me or are the two contactors shown in the bottom of the picture (on the orange pad) wired in series? No matter what path I follow, one of the two conctactors follows the other in series.

Maybe one is used for a safety lockout?
 
I know you’re build has been done for a while now but I have been building mine for a few months now and have a question on your wiring schematic. Maybe it’s a question


I know you’re build has been done for a while now but I have been building mine for a few months and have a question on your wiring schematic. Maybe it’s a question for @doug293cz?
These LED indicator lights. Is there a specific reason you have the 220v one? In my mind you could wire it with 110 from the active side of the SSR to know it’s firing. Unless there is more information you get from having it wired with 220...🤔
A 120V LED indicator wired from the load side of the SSR to neutral will always be on. This is because when the SSR is off, the LED is connected in series with the element to the other hot line. The element is a low value resistor, and the LED has a high impedance, so the voltage drop will mostly be across the LED, turning it on.

Brew on :mug:
 
Is it just me or are the two contactors shown in the bottom of the picture (on the orange pad) wired in series? No matter what path I follow, one of the two conctactors follows the other in series.

Maybe one is used for a safety lockout?
Yes the contactors are in series to the SSR and element, but the power for the pump and EZBoil does not go thru the second (element enable) contactor. The first contactor (closest to the power input) is the main power contactor, which controls all power to the panel, not just the element.

Using a contactor for the main power control does allow a safe start interlock to be implemented, although the design in this thread does not do that. The safe start interlock prevents the main power from being turned on if either the pump or element enable switch is on. So, you would have the pump or element come on unexpectedly when turning on the main power.

Here's a design very similar to OP's that implements the safe start interlock:

DSPR300 1-Pump 1-Element 240V rev-2.PNG


Brew on :mug:
 

Latest posts

Back
Top