OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 13, 2013 #31 Digital thermometer mounted on water distillation apparatus
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 13, 2013 #32 Mash tun manifold. Im a little confused on where I should drill the holes in the pipes, am I supposed to drill holes in all of the pipes or only the ones which run left to right? Maybe only the five center ones which run from left to right?
Mash tun manifold. Im a little confused on where I should drill the holes in the pipes, am I supposed to drill holes in all of the pipes or only the ones which run left to right? Maybe only the five center ones which run from left to right?
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 17, 2013 #33 Mash tun drain assembled, still need to cut the slots in pipe.
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 24, 2013 #34 Details of propane connection
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 24, 2013 #35 Burner number one on its mounts.
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 24, 2013 #36 Propane connection to burner number 1
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 24, 2013 #37 Burner number 1 mounted
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 24, 2013 #38 Burner number 1 on high.
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 24, 2013 #39 Burner number 1 on medium.
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 24, 2013 #40 Burner number 1 on low
OP OP R raw22 Well-Known Member Joined Feb 13, 2013 Messages 51 Reaction score 2 Apr 24, 2013 #41 Liebig condenser