snakerake
Member
Hi all,
Long time reader, but first post. I was hoping someone on here might take a look at this wiring diagram I have put together for the two tier, one pump system. I've looked at a lot of diagrams on the board for reference, as well as read Kal's PDF/book on the electric brewery, but none exactly what I'm aiming for. In short I am wanting to create a 120V electrical system to power a rims tube and heat sparge water in my Keggle HLT. My MLT is a cooler that holds temperature very well, so I don't imagine I'll need the full power of a 240V element.
To avoid dry firing the heating elements, the pump must be on before power will flow to the RIMS tube. I'm trying to keep my cost down on this build so I tried to keep the features as lean as possible.
Anyone care to take a look? I want to be as safe as possible. Thanks in advance!
Long time reader, but first post. I was hoping someone on here might take a look at this wiring diagram I have put together for the two tier, one pump system. I've looked at a lot of diagrams on the board for reference, as well as read Kal's PDF/book on the electric brewery, but none exactly what I'm aiming for. In short I am wanting to create a 120V electrical system to power a rims tube and heat sparge water in my Keggle HLT. My MLT is a cooler that holds temperature very well, so I don't imagine I'll need the full power of a 240V element.
To avoid dry firing the heating elements, the pump must be on before power will flow to the RIMS tube. I'm trying to keep my cost down on this build so I tried to keep the features as lean as possible.
Anyone care to take a look? I want to be as safe as possible. Thanks in advance!

