I used my IC setup last night and it took me 25 minutes with 65* tap water to go from boiling to 70* wort. I have a 25' 3/8" pre-chiller that goes in a bucket of ice water, then it feeds a 50' 3/8" immersion chiller. Then racking takes another 5-10 minutes. Honestly, call me lazy but this is just too long, and I'm still not where I want to be for pitching temp. I can take that 25' pre-chiller and turn it into a CFC and rack the wort plus chill it at the same time, all in 5-10 minutes, and get it cooler than 70*. 5 hour brew days tend to suck after a while, especially when they're on a weeknight. Shaving 25 minutes off my day is worth a lot at midnight.