Well, like most of you I've been bitten. I love to build things and I love to cook so brewing is only natural. Only brewed two batches on my own. One extract one biab and one full blown three tier scotch ale all grain with a club member. That got me going. So my plan is stand that will hold the HLT up high and I will make a slide rack that my burner will go into for heat then I'll move it to the ground and put the BK on it to boil. The coleman extreme will sit next to and lower and as I said before the bk will be on the ground. I should have room under the HLT to store the BK.
Got pretty far on the tun tonight.
This pile of 1/2 inch square will be the stand.
I imagine I will eventually add a pump so I May borrow one and go ahead and make the brackets. I'm going to have this blasted and powder coated after I'm done. If the slide rack idea doesn't work I'll get a burner and bolt it up.
Ideas are greatly welcomed
Thanks guys
Got pretty far on the tun tonight.
![null_zpsbee5c4a6.jpg](https://proxy.imagearchive.com/488/488a77ab70f27ad539309944ba0ccf4d.jpg)
This pile of 1/2 inch square will be the stand.
![null_zpsb047950e.jpg](https://proxy.imagearchive.com/2d1/2d1d04cffb006ca4e954c20e840d75d7.jpg)
I imagine I will eventually add a pump so I May borrow one and go ahead and make the brackets. I'm going to have this blasted and powder coated after I'm done. If the slide rack idea doesn't work I'll get a burner and bolt it up.
Ideas are greatly welcomed
Thanks guys